,廖婷婷.,徐哲,李明.项目员工加班调度多目标优化模型与算法.工业工程
, Hongbo Li, Jing Yu,Zhe Xu.Analyzing Integrated Cost-Schedule Risk for Complex Product Systems R&D Projects. Journal of Applied Mathematics
, Zhe Xu, Jing Yu,Fang Xie.A Hybrid Genetic Algorithm for Resource-constrained Project Scheduling with Stochastic Overlapping Modes [A]. The twelfth International Conference on Industrial Management[C]. Beihang University Press
,徐哲,陶然.基于SERVQUAL的专业体检机构服务质量测量.工业工程
,于静,徐哲,胡晨.基于工期分布和多资源约束的关键链缓冲区大小计算方法.系统管理学报
,李明.,徐哲,廖婷婷.软件开发项目多技能人力资源均衡调度模型研究.工业工程
,于静,徐哲,李洪波.基于DSM的研发项目流程多目标仿真优化.系统工程理论与实践
,Yinbin Liu, Li Xiong, Zhe Xu,Hongbo Li.obust proactive project scheduling model for the stochastic discrete time/cost trade-off problem. Discrete Dynamics in Nature and Society, vol.
,李洪波,徐哲,于静.带有活动重叠的资源受限项目调度问题建模与求解.系统工程理论与实践
, Zhe Xu,Hongbo Li.Erik Demeulemeester. Scheduling Policies for the Stochastic Resource Leveling Problem. Journal of Construction Engineering and Management